Project Menaiktaraf Jalan Oya-Mukah-Balingian, Sarawak PAKEJ 2 : Menaiktaraf Jalan Dari Persimpangan Kg. Matadeng Ke Balingian

Cost RM119.85 Million
Duration 01 October 2003 - 09 November 2006
Client Jabatan Kerja Raya Sarawak
Description

This project form part of the vital link of the coastal road. This road will link Mukah and Balingian towns to promote trade activities around the region.

Service Provided

This professional services provided include supervision (as PDR) of approximately 31 km of road to JKR's Modified R3 Geometric Standard.

Proposed Upgrading of Existing Earth and Gravel Road Linking Pantai Pandan To Kpg. Belungei and Kpg. Pugu, Lundu Kuching Sarawak (11km)

Cost RM23 Million
Duration July 2016 - August 2017
Client Jabatan Kerja Raya Sarawak
Description

This project covers the followings:

  • The construction of access road from Pantai Pandan to Kpg. Pandan to Kpg. Belungei and Kpg. Pugu, Lundu.
  • The project involces upgrading approximately 11.7km of the existing earth and gravel road and R1 tar sealed road linking Pantai Pandan to Kpg Belungei and Kpg Pugu.
  • The existing road will be improved, widened and upgrade to two (2) lane single carriageway JKR R3 Rural Road standard, having 6m wide sealed carriageway and 2.5m wide shoulder and 0.25m marginal strip on each side as well as constructiion of 1 no. new single span RC brige.
  • All site establishment
  • All earthwork including any environmental protection and mitigation measures
  • Remedy of any defects in te works during Defect Liability Period
Service Provided

The professional services provided consist of site investigation, design and supervision.

Pembinaan Jalan Baru Ke Lapangan Terbang Limbang, Sarawak (Phase 1)

Cost RM4.7 Million
Duration April 2005 - October 2006
Client Jabatan Kerja Raya Sarawak
Description

This project form part of the vital link of the Limbang town road. This road will link Limbang Town to the Limbang Airport.

Service Provided

The professional services provided consist of site investigation, design and supervision, submission and obtaining approval from local authorities of approximately 3 Km road to JKR's U5 Geometric Standard Two (2) lanes single carriageway.

Construction and Completion of Proposed Roads in Limbang Town Extension Area (Phase 1), Sarawak

Cost RM7.4 Million
Duration 16 February 2005 - 11 October 2007
Client Jabatan Kerja Raya Sarawak
Description

This project form part of the vital link of the Limbang New Township Extension. This road will together with two spur roads pass through future government office sites.

Service Provided

The professional services provided consist of site investigation, design and supervision, submission and obtaining approval from local authorities of approximately 3 Km road to JKR's U5 Geometric Standard Two (2) lanes single carriageway.

Membina Jalan Pasir Pandak/Pasir Panjang, Santubong Bahagian Kuching Sarawak

Cost RM8.4 Million
Duration June 2009 - July 2012
Client Jabatan Kerja Raya Sarawak
Description

This project covers the followings:

  • The construction of Jalan Pasir Pandak / Pasir Panjang, Santubong to be design of:
  • Two lane carriageway complete with 50mm thick asphaltic concrete binder course ACB 28 and 50mm thick asphaltic concrete wearing course ACW 20.
  • Construction of new culvert and concrete drain
  • Roadline marking and roadside furniture
  • All site establishment
  • All earthworks including any environmental protection and mitigation measures
  • Remedy of any defects in the works during Defect Liability Period
Service Provided

The professional services provided consist of site investigation, design and supervision.

Reconstruction And Upgrading Of The Betong-Kayu Malam Road Pakej B - Dari Simpangan Spaoh Ke Sg. Malupa (23Km)

Cost RM39.26 Million
Duration 23 May 2000 - 30 September 2004
Client Jabatan Kerja Raya Sarawak
Description

This project involved upgrading of the existing trunk road joining Betong and Sarikei town by improving its geometry design which include straightening of sharp bend, reducing the gradient of steep road and widening of the existing road.

Service Provided

The professional services provided consist of site investigation, design and supervision, submission and obtaining approval from local authorities of approximately 23 Km road to JKR's Modified R3 Geometric Standard.